How EPC Contractors Can Ensure On-Time Solar Project Delivery
Delays in EPC solar projects don’t just increase cost—they riskpenalties, lost credibility, and even canceled contracts.
One of the most common causes? Sourcing errors, fragmented vendors, and lack of shipping coordination.
At thlinksolar, we’ve helped EPC contractors avoid costly disruptions by offeringpre-configured kits,export-ready certifications, andrapid dispatchfrom our production line.
Here’s how you can secure every stage of your delivery plan.
What Typically Causes Solar EPC Project Delays?
1. Multiple Sourcing Points
Panels from one vendor, inverters from another, batteries from a third—this creates:
- 
Incompatible equipment 
- 
Asynchronous arrival times 
- 
Higher logistics and customs complexity 
According to a 2024 IEA report, 45% of global solar project delays were due to procurement miscoordination.
2. Lead Time Underestimation
High-power inverters and lithium batteries often have 25–40 day production cycles—longer if custom certifications are needed.
A project in Kenya was delayed 2 months when the inverter supplier couldn’t meet CE documentation in time for grid approval.
3. Missing Technical Documentation
Utility companies mayrefuse grid interconnectionif:
- 
Test reports are missing 
- 
No compliance files provided 
- 
No wiring diagrams or spec sheets 
How thlinksolar Helps EPC Projects Meet Their Timelines
1. Pre-Engineered Solar Kits
Our kits are configured for:
- 
Rooftop commercial systems (10–100kW) 
- 
Utility-scale ground-mount (250kW+) 
- 
Hybrid/off-grid village systems 
All kits include:
Panels + inverter + battery (optional)
Mounting + wiring BOM
Pre-approved documentation pack
You receive a plug-and-play system matched to your project spec.
2. In-Stock High-Demand Inverters
We maintain inventory for:
- 
5kW–30kW hybrid string inverters 
- 
50kW–250kW industrial models 
- 
Off-grid all-in-one systems 
These can be shipped in3–7 days, reducing your procurement window by up to 40%.
3. Engineering Documentation Support
Each thlinksolar shipment includes:
- 
Electrical schematics 
- 
String configuration suggestions 
- 
Certificate packs (TUV, CE, IEC, etc.) 
- 
Warranty documentation 
Saves your engineering team 7–10 days of drawing and compliance prep.
Best Practices for EPC Delivery Planning
| Step | Tip | 
|---|---|
| Component Sourcing | Use 1–2 suppliers max to reduce logistics failures | 
| Inverter Availability | Check production + certification lead time upfront | 
| Shipping Coordination | Use suppliers with customs/export experience | 
| Documentation Prep | Confirm drawings and grid certificates before payment | 
| On-Site Buffering | Plan 5–7% spares in BOM for site risk mitigation | 
Real Case: 100kW Government School Project in the Philippines
Goal: Install hybrid solar in 45 days before school reopening
Challenges:
- 
Grid approval required CE + IEC docs 
- 
Island site with weekly shipping only 
- 
System needed batteries due to weak local grid 
What we did:
- 
Supplied full kit: hybrid inverters, 20kWh lithium batteries, CE-certified panels 
- 
Delivered from port to site in 9 days 
- 
Provided real-time logistics updates + remote engineer support 
Result: Commissioned 2 days ahead of deadline, full payment released without penalties.
EPC Projects Are Won—and Lost—on Timelines
Your bid is only as strong as your ability todeliver on time.
At thlinksolar, we support EPC contractors with:
- 
Factory-direct sourcing 
- 
Modular system kits 
- 
Global logistics coordination 
- 
Certification-ready product lines 
- 
Dedicated engineer support 
Whether you’re racing to meet a grid-tied handover or running an off-grid rural install, our delivery system is built for speed and stability.